Analyzing TSMC's fab expansion roadmap — multi-fab N2 ramp, CoWoS, SoIC, and uncorking bottlenecks

8 hours ago 11
The TSMC logo is displayed at the Taiwan Semiconductor Manufacturing Company branch and Innovation Museum (Image credit: Getty Images / Jimmy Beunardeau)

Swipe to scroll horizontally

TSMC's new or ramping production facilities

Site Name

Phase

Capabilities

Fab Location

Status

Fab 20

1, 2

A16, N2

Hsinchu, Taiwan

Ramping

Fab 21

2

N3

Phoenix, Arizona

Equipping

Fab 21

3, 4

A16, N2

Phoenix, Arizona

In construction

Fab 22

1

A16, N2

Kaohsiung, Taiwan

Ramping

Fab 22

2, 3

A16, N2

Kaohsiung, Taiwan

Equipped, ramping in H2 2026

Fab 23 - JASM

2

Down to N3

Kumamoto, Japan

In construction as of January 2025. Construction stalled.

Fab 24 - ESMC

1

N12, N16, N22, N28

Dresden, Germany

In construction as of August 2024

Fab 25

1

A14, A13, A12

Taichung, Taiwan

In construction

TSMC
(Image credit: TSMC)
TSMC
(Image credit: TSMC)
TSMC
(Image credit: TSMC)
TSMC
(Image credit: TSMC)
TSMC
(Image credit: TSMC)
TSMC
(Image credit: TSMC)

Anton Shilov is a contributing writer at Tom’s Hardware. Over the past couple of decades, he has covered everything from CPUs and GPUs to supercomputers and from modern process technologies and latest fab tools to high-tech industry trends.

Read Entire Article