TSMC’s $22.6 billion Texas plan wouldn’t make 2nm-or-better chips until 2031

1 hour ago 13
TSMC Fab (Image credit: Getty Images / Anadolu)

Follow us

Add us as a preferred source on Google

TSMC has made an application for a new fab and campus near College Station, Brazos County, Texas. The proposed fab would be just one county over from Terafab, would likely share supply chains, and would be positioned to make 2nm-class chips by 2031, with the $22.6 billion plan detailing how the Taiwanese chipmaker is planning to expand its U.S. operations. An application under Texas’s Jobs, Energy, Technology and Innovation (JETI) program for a school property-tax limit shows TSMC is weighing a new fab site. The fab wouldn’t make 2nm or more advanced chips until 2031, six years after 2nm volume production began in Taiwan. It would come with a school-tax break valued at around $354 million.

This would be the company’s “second campus” for advanced chipmaking in the U.S. and the first outside Arizona. The Comptroller has recommended the tax application for approval, which the school district and the governor still have to grant. The application comes from TSMC Arizona Corporation, which is TSMC’s subsidiary located in Phoenix. Construction is projected to start in 2027, but the plan remains under evaluation, and nothing in the filing commits TSMC to buy the land or to build on it.

Shane Downing is a Contributing Writer for Tom’s Hardware, covering consumer storage, PC hardware, and AI.

Read Entire Article