Tesla and SpaceX are building a research chip fab at Giga Texas as the first step toward a far larger semiconductor operation in Grimes County
Tesla is building a research chip fabrication plant in Texas. The goal is to shorten the time it takes to develop new chips.
The facility is part of Terafab, a joint project between Tesla and SpaceX. Most car companies buy their chips. Tesla now wants to make its own.
What Terafab actually is
Elon Musk announced Terafab on March 21, 2026. It aims to create a vertically integrated semiconductor operation that produces advanced AI chips.
The first piece is a research fab at Tesla’s Giga Texas campus in Austin. Its estimated cost is $3 billion, and construction started in April 2026.
The research fab is designed for rapid prototyping. That means quickly testing new chip designs before committing to mass production.
The bigger build comes later. The main production site is planned for Grimes County, Texas.
That facility carries an initial investment of $16.8 billion. Plans call for more than 100 million square feet of operational space.
The project is projected to create at least 3,000 jobs.
Why Tesla and SpaceX want their own chips
Terafab is mainly focused on supplying chips for Tesla’s vehicles, its Optimus humanoid robots and its Cybercabs.
SpaceX has its own reasons to join. The company is planning space-based data centers, which will need AI hardware of their own.
The project’s long-term goal is 1 terawatt of annual AI compute capacity.
Intel joins the build
Terafab is not going it entirely alone. Intel joined as a foundry partner on April 7, 2026.
A foundry manufactures chips that other companies design. The partnership targets Intel’s 14A process node.
What this means
For Tesla, the main stake is control. Owning chip development could let the company tune hardware specifically for its self-driving, robotaxi and robotics software.
For SpaceX, Terafab offers a path to hardware for its planned orbital data centers. Shared infrastructure between the two companies could spread the enormous cost across more products.
For Intel, landing Tesla and SpaceX as partners is a meaningful foundry win. It also places the 14A node at the center of a very public, very ambitious project.
Texas stands to benefit too. A projected 3,000 or more jobs in Grimes County, plus the Austin research site, would deepen the state’s role in advanced manufacturing.
The risks are real. The investment figures are estimates and initial commitments, and fab projects are known for delays and cost overruns.
The 1 terawatt goal is also a long-term target, not a near-term deliverable.
Disclosure: This article was edited by Diego Almada Lopez. For more information on how we create and review content, see our Editorial Policy.

2 hours ago
15








English (US) ·